The visibility of joint programmes and actions shall consist of a co-branding. The European emblem (displayed on the left), the CoE logo (displayed on the right) and the textual mentions as defined below. The equal prominence of the European emblem and CoE logo shall be ensured whenever the visibility of Actions is displayed.

Programmes signed before October 2020 used an earlier version of the joint logo and may do until their completion. This includes in particular Horizontal Facility II, Partnership for Good Governance II. Earlier versions of the joint logo can be found a this link : https://www.coe.int/en/web/project-management-methodology/joint-logos-before-october-2020-ffpa

The mandatory information elements for individual joint programmes are:

Case 1: Funded by the European Union and the Council of Europe
 

 

 PNG download (web format)

Arabic|Albanian |Armenia|Azerbaijani|Bosnian

Bosnian in cyrillic | Croatian 

English |Finnish| French |Georgian|Greek| kyrgyz | Kazakh  

Macedonian Montenegrin |Romanian | Russian

Serbian in cyrillic |Serbian in latin| Slovenian | Swedish | Tajik Turkmen 

Turkish | Ukrainian |Uzbeck in cyrillic

 EPS download (print format)

Arabic | Albanian | Armenian| Azerbaijani |Albanian

Bosnian | Bosnian in cyrillic | Croatian 

English |Finnish| French | Georgian|

Greek |Kyrgyz | Kazakh  

Macedonian Montenegrin | Romanian |Russian |

Serbian | Serbian in cyrillic | Slovenian Tajik

Turkmen | Turkish | Ukrainian | Uzbeck in cyrillic

 

Case 2: Funded by the European Union and Implemented by the Council of Europe
 


Applicable to projects where Council of Europe funding accounts for less than 10 % of the total budget.
 

 PNG download (web format)

Arabic English French

 EPS download (print format)

Arabic English French

 PNG download (web format)

Arabic | English | French

EPS download (print format)

Arabic | English | French

 PNG download (web format)

Arabic | English | French

EPS download (print format)

Arabic | English | French

For general reports

 PNG download (web format)

EPS download (print format)

 PNG download (web format)

EPS download (print format)

 PNG download (web format)

EPS download (print format)

Logo for the Council of Europe original publications translated with the financial support of joint programme under Case 1

Logo for the Council of Europe original publications translated with the financial support of joint programme under Case 2

 PNG download (web format)

 EPS download (print format)

 PNG download (web format)

 EPS download (print format)

 PNG download (web format)

 EPS download (print format)

 Did you know?
The Committee of Ministers is the Council of Europe's decision-making body. It is made up of the Foreign Ministers of all member states or their permanent representatives in Strasbourg.

Quiz

Кој ден во годината се слави Денот на Европа?

  1. 1 мај
  2. 8 март
  3. 5 мај
Close

Погрешен одговор...

Close

Погрешен одговор...

Close

Точен одговор!